We know that stakeholders in our community will have questions about what the Centralville Sewer Separation Project means for their neighborhood. Below you’ll find answers to some of the most common questions—covering everything from construction impacts and timelines to funding and public notifications.

If you don’t see your question here, please reach out to the Lowell Regional Wastewater Utility at sewer@lowellma.gov or call (978) 674-4248.

The Centralville neighborhood currently has a combined sewer system (96% combined), meaning stormwater and sewage flow through the same pipes. During heavy rainfall, this system can become overwhelmed, leading to untreated sewage discharges into the Merrimack River and potential flooding of streets and nearby properties. Separating the stormwater and sewer systems will help reduce local flooding and significantly improve water quality in the river. The project will also include upgrades to other underground utilities and roadway infrastructure throughout the Centralville neighborhood.

Construction along the project route will affect streets and sidewalks, resulting in temporary access restrictions and possible rerouting of vehicle and pedestrian traffic. The Lowell Regional Wastewater Utility will provide advance notice to residents and the public and will work to maintain access whenever possible.

The project will install a new storm drain system, upgrade and rehabilitate existing sewer infrastructure, replace or repair sewer laterals, and remove excess groundwater entering the system (inflow and infiltration). These improvements will help prevent sewer backups, improve water quality in the Merrimack River, and modernize aging infrastructure. Additional improvements include upgrades to hydrants, valves, water mains, gas utilities, roadways, sidewalks, and the implementation of traffic calming measures.

The Centralville Sewer Separation Project covers approximately 490 acres of the Centralville neighborhood. Work will take place in phases across multiple streets to upgrade sewer, stormwater, and water main infrastructure. While the final construction schedule may shift, the project area includes:

  • Key corridors such as Bridge Street, Aiken Avenue, and Bunker Hill Avenue.

  • Neighborhood streets extending across Centralville, including areas near Humphrey’s Brook, Billings Street Wetlands, and Hovey Field Wetlands.

  • Residential side streets where sewer services, water mains, and drainage connections will be replaced or rehabilitated.

The map below depicts the streets included in the scope of the three phases of the project.

The project will be carried out in multiple phases. Phase 1 is expected to begin in 2025 and includes construction near key outfalls. Phase 1 pipeline construction will be completed in spring 2028 with final paving being completed in the summer of 2028. Future phases (2A and 2B) are anticipated to begin construction in 2027 and 2028.

Yes, the Lowell Regional Wastewater Utility and project team will attend public meetings and workshops to provide updates and gather feedback. Translation services will be available. The Utility can be reached 24/7 by phone at 978-674-4248 to assist with any inquiries.

Most of the work will occur in public streets and utility corridors. However, some temporary easements or access may be needed during construction. Property owners will be contacted in advance if access is required.

Traffic management plans will be in place to minimize disruptions. Periodic road closures will be needed at various phases of the work, with detours, police details, and clear signage used where necessary. Sidewalk access will be maintained for pedestrians.

You can reach the project team by email (sewer@lowellma.gov) or call (978) 674-4248.