Lowell Regional Wastewater Utility

Phase 3 Treatment Facility Upgrades

Investing in the Future of Wastewater Treatment

The Lowell Regional Wastewater Utility is upgrading critical equipment and treatment processes at its wastewater treatment facility to improve reliability, increase efficiency, and continue protecting the Merrimack River.

The Phase 3 Treatment Facility Upgrade focuses on replacing aging infrastructure, modernizing treatment equipment, and improving phosphorus removal to meet current and future environmental standards. These investments will help ensure reliable wastewater treatment while reducing long-term operating and maintenance costs.

Why This Project Is Needed

Every day, the Lowell Regional Wastewater Utility treats wastewater from Lowell and portions of surrounding communities. Many of the treatment plant’s systems have been in service for decades and require increasing maintenance as they age.

By replacing critical equipment before it reaches the end of its useful life, the Phase 3 Upgrade will improve reliability, reduce maintenance costs, and help maintain high-quality treatment for the community and the Merrimack River.

Cleaner Water

A new chemical treatment process will improve phosphorus removal before treated water is discharged to the Merrimack River, helping reduce the potential for algal blooms and supporting healthier waterways.

Reliable Operations

New chlorination, dechlorination, sludge processing, and dewatering equipment will strengthen treatment reliability and improve day-to-day operations.

Energy Efficiency

Modern aeration equipment, upgraded electrical systems, and new process equipment will improve efficiency while reducing long-term operating and maintenance costs.

High Flow Management

Our combined sewer system requires a robust data collection and communication network in order to manage the wet-weather flows generated by rainfall over the developed portions of the city. Since 2011, multiple communication networks and real-time sensors have been developed on a secure network to enable our High Flow Management program, the goal of which is to:

  1. Maximize wet-weather flows to the Duck Island Clean Water Facility for proper treatment;
  2. Utilize the available in-line storage of our large-diameter interceptor pipes to reduce CSO volume and frequency, and; 
  3. Minimize combined sewer overflow (CSO) discharges through frequent review and optimization of this process.
Modernizing Lowell’s Water & Wastewater Infrastructure.
Stay connected for updates on City of Lowell water and wastewater projects, including construction notices, public resources, and long-term infrastructure improvements.
Contact